Ship and Crane Arrival

  • 10th of February, 2011, the ship arrives at Albany Port
  • Two days later, the cranage and supporting semis arrive

Sorry, no public access. Laying the builders black plastic. Rolling the soil replacement. Pouring the blinding. Delivering reinforcing steel for two turbine foundations. Basket weaving begins.
© Copyright 2011 SkyFarming Pty LtdBack